Computation Process & Conventions

Verification of the wall is done in the following sequence:

Phase I

Terrain pressures and any surcharge on the stem are calculated. The stem is then divided into a fixed number of segments that will hereafter be the verification segments. For this phase, the thrust surface is taken to be the face of the stem. If Coulomb 's method is selected the thrust is considered at an angle corresponding to the terrain wall angle of friction declared in the geotechnic properties. If Rankine's method was selected the thrust is considered to be horizontal. In phase I, the program determines stresses only on the stem and performs structural verification using the materials specified by the user and the selected criterion (Admissible Tension, or Limit State).

Phase II

In this phase pressures calculations are repeated taking as thrust surface the vertical line that passes through the uphill edge of the foundation heel. This time, with Coulomb’s method, it is the angle of soil resistance that is used. Then all pressures (Overturning and stabilizing moments) are determined in respect to the datum point that is the lower corner of the foundation toe. Thereafter the program performs Ultimate limit state, Overturning, Sliding, and Limit load verifications.

Phase III

In this phase the stresses on the footing shelves, segmented to a fixed number, are determined. Then structural verification on the footing is performed. If the footing is not anchored on piles, this completes the calculation.

Phase IV

This last phase is only relevant where piles are present. The actions transmitted by the wall to the pile foundation are the horizontal force, the vertical force and the moment obtained in phase II. The user may choose to transmit to the piles the resulting moment (equilibrium of all the actions, overturning and stabilizing) or only the overturning moment, which is the conservative choice; in both cases the moment is transferred to the centroid of the pile heads. Only a part (from 70% to 100%) of the vertical loads and of the moment can also be assigned to the piles: the rest goes to the soil under the pile cap.

The actions are distributed among the rows considering the pile cap as rigid, with the axial and transverse stiffness of each pile, the inclinations of the rows and the hinged or fixed pile-cap connection. The program then checks all the rows: the bearing capacity is governed by the row with the minimum safety factor, the reinforcement by the envelope of the internal forces of all the rows. The model is described in Pile group.